-In 2005, Gascool was awarded a 20 years contract, of EGP 40.000.000, build, own, operate the utilities plant to supply electricity,chilled / hot water for the district cooling / heating of the AUC new campus in new Cairo, as well as hot water service.
-The hot water service is Cogenerated by the use of exhaust gas from of gas generator sets from 3 × 1600 KW gas generating sets together with heat recovery boilers .
-The electric requirement of the AUC campus is served by gas fired generator sets and the peak load is imported from the national grid.
-The plant consists 4 x 1200 RT + 1 x 700 RT Ebara gas fired absorption chillers.
-Two hot water boilers of 600 KW capacity each, and three generator sets rated at 2000 KVA each.
-The plant provides both chilled water and hot water to the piping system.
-Start-up of the project in May 2007.
- Build, own, and operate projects (B.O.O)