-The central chilled water air conditioning system for the operation theaters.
-The system is automatically controlled by a building management system.
- Total cooling capacity:
260 RT using Ebara direct fired natural gas absorption chillers.
- Total HVAC cost:
EGP 5.000.000
- GasCool scope of work:
Supply, installation, commissioning and start up of HVAC system.