-Full replacement of the old system that consists of 75 chiller of 5 Ton Refrigeration each, with a central station that provides all the buildings with chilled water with a total cooling capacity of 400 Ton Refrigeration (nominal capacity), using direct fired absorption chillers.
- Project execution phases
This project is executed on three phases:
- phase 1 200 TR
- phase 2 100 TR
- phase 3 100 TR
- The HVAC cost:
4.3 million Egyptian pounds.
- GasCool scope of work:
Basic design, detailed engineering, construction supervision and start up for HVAC system equipment.